Cummins 4BT & Diesel Conversions Forums banner

KDP kit, which one too get??

3K views 7 replies 5 participants last post by  SUBRUTUS  
#1 ·
Hey gang,
Need a little help here. Most of the KDP kit I've seen on the mrket are for dowels that have a flat area that the tab can cover. Well looking at mines, it aint that. There's like side walls, or a hole it sits in and the bolt is on the flat surface. Would this mean I'd have to make my own or modify one, or do you know of someone that make one for this particular style. Bette yet, if your is similar what did you do?

Blessings,
Ron
Image
 
#2 ·
I have used this type on my 4 and 6bt's, its a dual position part and works on flat and stepped gear cases
Image
 
  • Like
Reactions: SUBRUTUS
#8 ·
NICE...
 
#3 ·
Just cut a piece of copper or Alu as they are soft and can be shaped to fit the area to be filled. You are only preventing a pin from sliding/walking out, no real pressure is applied to the dowel as it sits in place. A piece of pine would work in theory.
 
#4 ·
Like the guys say, this isn't rocket science. You could take a lid off a tin can and cut it to shape, put a few bends and a hole and you have all that is needed. Remember to clean out the bolt hole and reinstall the bolt with some blue Loctite. Need to do that with all the other bolts behind the front cover. Those sometimes work loose and they can be as bad or worse than that little dowel pin.
 
#5 ·
The only advantage to using this type is that you know the bolt and hold down will never walk out with the gear cover on... I've done the tab also, very easy, but 2 hold downs for $15 and trying something different... works for me
 
  • Like
Reactions: plumjav69